CEE 4th National Power-Gen Leadership Awards 2026

As India pushes toward 500 GW of renewable capacity by 2030, thermal power plants are being asked to do something they were never designed for: ramp up, ramp down, and run on demand.

Date 07th September 2026
Venue The Suryaa
New Friends Colony
New Delhi
The Theme

&

Grid stability now depends on how fast thermal assets can respond — not just how much power they generate.

500 GW renewable target by 2030
40% minimum load mandate
23 GW renewable energy curtailed
692 boiler tube leaks since 2021–22
2.3 TWh solar curtailed, May–Dec 2025
50.48 Hz frequency under emergency dispatch
Conference Overview

Flexible Operations & Energy Transition

As India pushes toward 500 GW of renewable capacity by 2030, thermal power plants are being asked to do something they were never designed for: ramp up, ramp down, and run on demand.

23 GW Renewable energy already curtailed during high-solar periods
40% New minimum-load target regulators are pushing coal plants toward
692 Boiler tube leaks reported by NTPC across its fleet since 2021–22
10 Flame failures reported alongside those leaks, same period

Renewable Scale-Up & Curtailment

CEA Flexible Operation Regulations, 2023
Coal-fired units must now demonstrate flexible operation capability down to a minimum power level of 40 per cent.
How plant types compare
Hard coal ramps at 2–9% of capacity per minute with 10–40% minimum loads; gas (CCGT) ramps faster; batteries move from zero to 100% almost instantly.
CEA draft committee finding
Low-load operation at 55% MTL under conservative ramp rates hasn't shown significant measurable damage — cyclic start/shutdown events matter more than steady low-load running.
2.3 TWh of solar curtailed
Between May–December 2025, concentrated in states where thermal plants lacked operational flexibility.
50.48 Hz
On one day in 2025, Grid-India backed the national thermal fleet down to 58% load and curtailed nearly 10 GW of solar through emergency dispatch — and frequency still rose to 50.48 Hz. That's how tight the operating margin already is.

Core Challenges

01
Plants Weren't Built For This
India's coal fleet is a baseload design. Operating below the conventional 55% MTL threshold introduces thermal and mechanical stress the original engineering didn't fully account for, particularly in older units.
02
Genuine Disagreement on the Data
NTPC argues flexible/two-shift operation is measurably damaging its fleet. CEA's review committee, looking at the same incidents, attributes most damage to ageing infrastructure and coal quality instead. Unresolved as of CEA's latest draft report.
03
Coal Quality Compounds the Problem
Indian coal's high ash content makes stable combustion difficult at low loads to begin with — independent of cycling stress.
04
Storage Isn't a Complete Substitute Yet
BESS and pumped storage are scaling fast but aren't friction-free: a planned 150 MW SECI ancillary-services pilot was cancelled.

Opportunities & Solutions

CEA has already notified the 40% MTL target with a phased implementation roadmap (2022 regulation, 2023 notification) and proposed incentives for flexible operation. The direction of policy is set; the open question is execution speed and how compensation gets structured.

CEA's draft findings suggest the highest-leverage fix isn't expensive plant redesign, but better-executed start-ups, shutdowns, and ramp management — supported by OEM consultation and improved controls. Lower-capital, faster to implement than full mechanical retrofits.

Turnkey BESS costs fell roughly 40% in 2024 alone, and auction tariffs followed. Combined with VGF support covering up to 40% of capital costs, storage is shifting from a future option to a near-term, bankable complement to thermal flexibility.

Active consultations — including Grid-India's AGC/SRAS framework proposal and CERC's storage tariff reforms — show India building the market mechanisms to properly compensate flexibility for both thermal and storage assets. As these mature, the financial case for flexibility retrofits should strengthen.

NTPC's entire thermal fleet already operates at a technical minimum load of 55% during periods of low demand — a proven, fleet-wide benchmark, not a one-off pilot. NTPC is pushing further, inviting proposals for new 150–250 MW units built to run two shifts at just 25% minimum load, and has issued an Expression of Interest for flexible thermal units in that range to support grid balancing.

What This Event Is About

Taken together, the evidence above points to a consistent pattern: the technology and the operational playbooks for flexible thermal operation already exist, tested in pilot form. What's missing isn't capability — it's adoption, and the sector's biggest structural gap is the absence of shared, verified data on what flexible operation actually costs plants in wear, maintenance, and lifespan.

No single utility, OEM, or regulator can resolve that disagreement alone.

This event is built around that exact problem. Rather than leaving each utility to relitigate the same trade-offs in isolation, it brings together power producers, OEMs, regulators, and grid planners to share real pilot data, operational strategies, and lessons from the field — so plants don't have to learn the hard way what others have already tested.
Join Us

Why Attend & Who Should Be There

Why Attend

  • Hear directly from utilities, OEMs, and regulators navigating the same operational trade-offs at your plant
  • Get ahead of CEA guidelines before they become mandates
  • Learn what's actually working — and what's breaking — in early flexible operation pilots
  • Understand the maintenance, compensation, and asset-management implications before committing capital

Who Should Attend

  • Thermal plant operators, plant heads, and O&M teams
  • Grid and system planning professionals
  • OEMs and equipment manufacturers (boilers, turbines, control systems)
  • Policymakers and regulators (CEA, Grid-India, state utilities)
  • Asset management and reliability engineers
  • Energy transition and sustainability strategists
The Awards

CEE 4th National Power-Gen Leadership
Awards 2026

The CEE 4th National Power-Gen Leadership Awards 2026 recognize and celebrate visionary leaders, outstanding teams, and pioneering organizations that are driving excellence, innovation, operational efficiency, digital transformation, and sustainability across India's power generation sector. Organized by the Council of Enviro Excellence (CEE), these prestigious awards honour exceptional contributions by professionals and power plants that have demonstrated leadership in enhancing plant performance, embracing advanced technologies, and fostering a culture of continuous improvement. The awards provide a distinguished platform to acknowledge industry excellence, inspire best practices, and promote the future-ready transformation of the thermal power industry.

Categories

Operational Excellence Categories

Independent Power Producers & Captive Power Plants

IPP
Independent Power Producers
Coal
Excellence IPP Coal Unit
Below 500 MW
Coal
Excellence IPP Coal Unit
500 – 1000 MW
Coal
Excellence IPP Coal Unit
1000 – 1500 MW
Coal
Excellence IPP Coal Unit
Above 1500 MW
Lignite
Excellence IPP Lignite Unit
125 – 250 MW
Lignite
Excellence IPP Lignite Unit
Above 250 MW
CCGT
Excellence IPP CCGT Unit
Below 125 MW
CCGT
Excellence IPP CCGT Unit
Above 125 MW
CPP
Captive Power Plants
CPP Coal
Excellence CPP Coal Unit
Below 50 MW
CPP Coal
Excellence CPP Coal Unit
50 – 135 MW
CPP Coal
Excellence CPP Coal Unit
Above 135 MW
Public Sector / Private Sector
Plant Excellence Categories
Excellence Coal Plant of the Year
Excellence Lignite Plant of the Year
Excellence CCGT Plant of the Year
Excellence CPP Coal Plant of the Year
Excellence Biomass Utilization Plant of the Year
Excellence Digital Initiative Plant of the Year
Excellence ESG Initiative Plant of the Year
Excellence Corporate Social Responsibility Plant of the Year
Excellence Safety Initiative Plant of the Year
Excellence Renewable Integration Plant of the Year
Excellence Innovation Operations & Maintenance Plant of the Year
Excellence Innovative Flexible Operation Strategy Plant of the Year
Excellence Energy Transition Plant of the Year
Excellence Plant Load Factor Plant of the Year
Excellence Predictive/Preventive Maintenance Plant of the Year
Excellence Human Resource & People Management Plant of the Year
Excellence Compliance & Regulatory Adherence Plant of the Year
Excellence Corporate Communication & Brand Leadership Plant of the Year
Excellence in Grid Integration & Stability Plant of the Year
Leadership Excellence Categories
CEO of the Year
Leader of the Year
Women Icon of the Year
Team of the Year
Why Nominate

Key Benefits of Nominating

Seize the platform to be recognised as a leader in power generation and operational excellence

Showcase Achievements

Highlight your team's efforts in optimizing plant performance and setting benchmarks for industry peers.

Enhance Brand Reputation

Gain national recognition and credibility as a pioneer in flexible operations and grid-ready generation.

Foster Innovation

Inspire your workforce and others by demonstrating successful implementation of innovative operating strategies.

Encourage Industry Collaboration

Engage with industry leaders, policymakers, and experts, fostering growth and shared best practices.

Seize this opportunity to spotlight your dedication to operational excellence and grid flexibility. A nomination is not just an acknowledgment but a step toward building a more resilient and efficient power sector.

Take the First Step Towards Recognition Today!
Timeline

Key Dates

Step 01
1st July 2026
Nomination Opens
Step 02
26th August 2026
Nomination Closes
Step 03
27th August 2026
Evaluation Process Starts
Step 04
7th September 2026
Awards Ceremony
CEE 4th National Power-Gen Leadership Awards 2026

Registration

Delegate Registration

  • Indian Delegate
  • INR 22,500 + 18% GST Per Delegate
  • Overseas Delegate
  • USD 300 Per Delegate
  • Group Discount
  • 5% For 3+ Participants
  • 10% For 5+ Participants

Award Nomination

  • INR 33,500 + 18% GST Per Category
  • Discount 5% For 3+ Categories

Speaker Registration

  • Indian Speaker
  • INR 60,000 + 18% GST
  • Overseas Speaker
  • USD 800
Registration Process
Step 01
📄

Online Registration

To participate as Delegates, nominate for Awards, or be a Speaker, fill and submit the online form from the links above.

Step 02
🧾

Receive Invoice

We will email you an invoice along with the necessary documents for processing the payment. The original invoice will also be sent to your postal address.

Step 03

Make Payment

Make online payment via our secured payment gateway using your Credit Card, Bank Transfer, or send Cheque/DD to our postal address.

Delegate Registration
Award Nomination
Speaker Registration

Please Note

  • For each Award category, only one participant is permitted.
  • In case additional participants (of existing Award nominee) who wish to attend the event, will be charged a discounted price of INR 20,500 + GST per participant.
  • In each category, only 5 nominations are permitted.
  • Only the first 5 applications will be eligible for consideration.
  • Accurate participant information and details must be provided during registration.
  • The online registration is considered final, and no cancellations will be allowed once the registration is completed.
  • Successful online registration will result in a confirmation sent to the provided email address.
  • In case of technical issues with the online registration system, participants are encouraged to contact support at +91 98214 19110 for assistance.
Partnership & Visibility

Sponsorship Opportunities

Sponsorship Opportunities

Become a Partner in Excellence

Position your brand at the forefront of India's power generation industry. Sponsor the CEE Power-Gen Leadership Awards & Conference and connect with key decision-makers shaping the future of energy.

  • Enhanced brand visibility among industry leaders
  • Direct access to power generation professionals
  • Thought leadership and networking opportunities
Sponsorship Registration

Sponsorship Packages

Platinum
₹6,00,000
USD 8,000
Diamond
₹5,00,000
USD 7,000
Gold
₹4,00,000
USD 6,000
Silver
₹3,50,000
USD 5,000
Associate
₹2,50,000
USD 4,000
Lunch
₹2,00,000
USD 3,000
Welcome Kit
₹1,50,000
USD 2,500
Max Sponsors Permitted
1
2
3
3
3
2
4
Delegate Passes
8
6
4
4
3
3
2
Auditorium Stage Branding
Branding on Conference Website
Branding on LinkedIn
Special Announcements
Promotional Corporate Standee
Distribute Brochure in Welcome Kit
Sponsor Presentation Opportunity
1 slot · 30 min
1 slot · 30 min
Delegates List
Screening of Corporate Film
Upto 5 min
Upto 3 min
Upto 2 min
Panel Discussion Panellist
1 Award Nomination
Exhibition Stall Space (3×2 Mtrs)
Lobby Sponsor TV AV
Standee Acknowledging Lunch Sponsorship
Logo on Bags / Badges / Lanyard
GET IN TOUCH

CONNECT WITH US

HAVE QUESTIONS?
SV

Mr. Salim Valyani

Project Director

+91 9892800424 salim@ceeexcellence.org